百晓学者学者目录

钟登华

天津大学水利工程仿真与安全国家重点实验室

个人简介

钟登华,中国工程院院士,天津大学水利工程仿真与安全国家重点实验室主任,主要从事水利水电工程仿真与智能建设理论与技术及工程应用研究,研究方向包括水利水电工程、计算机软件及计算机应用、建筑科学与工程。

精选作品

期刊论文

  1. 钟登华,王佳俊,张君,王栋,余红玲,余佳,关涛(2026). 具身智能赋能水利工程智能建设现状、挑战及展望. 《水利学报》.
  2. 钟登华,张建云,张建民,王进廷,任炳昱,姚志峰(2026). 复杂恶劣条件下水电开发基础科学问题专刊. 《中国科学:技术科学》.
  3. 钟登华,张建云,张建民,王进廷,霍守亮,潘坚文,王睿,任炳昱,姚志峰(2026). 复杂恶劣条件下水电开发基础科学问题——第353期双清论坛学术综述. 《中国科学:技术科学》.
  4. 钟登华,李进,王佳俊,高浩钧,佟大威,吴斌平(2026). 堆石坝智能无人摊铺作业系统研发及应用. 《中国科学:技术科学》.
  5. Deng-Hua Zhong, Jian-Yun Zhang, Jian-Min Zhang, Jin-Ting Wang, Shouliang Huo, Jianwen Pan, Rui Wang, Bing-yu Ren, Zhi-Feng Yao (2026). Fundamental scientific issues of hydropower development under complex and harsh conditions——Academic review of the 353rd "Shuangqing Forum". Scientia Sinica Technologica.DOI
  6. Deng-Hua Zhong, Jia-Jun Wang, Jun Zhang, Dong Wang, Hongling Yu, Jia Yu, Tao Guan (2026). Embodied intelligence for the intelligent construction of hydraulic engineering: current status, challenges, and prospects. Journal of Hydraulic Engineering.DOI
  7. Deng-Hua Zhong, Jin Li, Jia-Jun Wang, Haojun Gao, Dawei Tong, Bin-Ping Wu (2026). Intelligent autonomous paver system for rockfill dams: development and application. Scientia Sinica Technologica.DOI
  8. 钟登华,张天鸿,余红玲,王佳俊,张君,余佳(2025). 智能时代与大坝工程建设智能化研究进展. 《水利学报》.DOI
  9. 曾拓程,王佳俊,钟登华,张雨诺,康栋(2024). 基于大场景视频监控的坝面施工机械潜在碰撞风险预警方法. 《水利学报》.
  10. 肖尧,钟登华,余佳,胡奕可,徐国鑫,陈秋同(2024). 基于改进HT-LCNN线段检测模型的隧洞施工活动时间信息智能提取方法. 《水利学报》.
  11. 刘伟平,矫勇,钟登华,米歇尔·利诺,张宗亮,贾金生,刘磊宁(2024). 科技创新引领中国坝工技术升级. 《中国水利》.
  12. 吕菲,钟登华,余佳,张君,张雨诺(2023). 迁移学习框架下高心墙堆石坝施工仿真参数IGOA-MLP动态预测模型. 《水利学报》.DOI
  13. 王佳俊,祁宁春,钟登华,佟大威,岳攀,崔博(2022). 高心墙堆石坝原生集成式智能无人碾压系统研发及应用. 《水利学报》.DOI
  14. Denghua Zhong, Zongxian Liu, Zhe Su, Kai Li, Xiaochao Li (2020). Predicting and controlling the cement intake during curtain grouting of dam foundations. European Journal of Environmental and Civil engineering.DOI
  15. 王佳俊,钟登华,关涛,佟大威,邓韶辉(2019). 基于KM和AC-BFA模糊逻辑的土石坝压实质量实时评价. 《水力发电学报》.
  16. 钟登华,时梦楠,崔博,王佳俊,关涛(2019). 大坝智能建设研究进展. 《水利学报》.DOI
  17. 钟登华,刘肖军,佟大威,王振,宋文帅(2019). 考虑施工质量影响的碾压混凝土坝地震动力响应. 《河海大学学报(自然科学版)》.
  18. 肖尧,钟登华,王栋,林威伟,王佳俊,刘震(2019). 基于ACDE-SVM的引水隧洞施工仿真参数动态更新. 《水力发电学报》.
  19. 钟登华,林瀚文,吴斌平,赵梦琦,余佳(2019). 基于M5P-SVR故障预测的地下洞室施工仿真. 《水力发电学报》.
  20. 钟登华,任炳昱,宋文帅,吴斌平,关涛,佟大威(2019). 高拱坝建设进度与质量智能控制关键技术及其应用研究. 《水利水电技术(中英文)》.
  21. 余佳,钟登华,肖尧,赵梦琦,林瀚文(2019). 基于机械故障精细分析的引水隧洞施工进度仿真. 《天津大学学报(自然科学与工程技术版)》.
  22. 王佳俊,钟登华,吴斌平,刘明辉,张宗亮(2019). 基于概念漂移检测的土石坝压实质量评价模型更新研究. 《天津大学学报(自然科学与工程技术版)》.
  23. Hu We, Denghua Zhong, Binping Wu, Zheng Li (2019). CONSTRUCTION PHASE ORIENTED DYNAMIC SIMULATION: TAKING RCC DAM PLACEMENT PROCESS AS AN EXAMPLE. Journal of Civil Engineering and Management.DOI
  24. Yichi Zhang, Pan Yue, Guike Zhang, Tao Guan, Mingming Lv, Denghua Zhong (2019). Augmented Reality Mapping of Rock Mass Discontinuities and Rockfall Susceptibility Based on Unmanned Aerial Vehicle Photogrammetry. Remote Sensing.DOI
  25. Jun Zhang, Denghua Zhong, Mengqi Zhao, Jia Yu, Fei Lv (2019). An Optimization Model for Construction Stage and Zone Plans of Rockfill Dams Based on the Enhanced Whale Optimization Algorithm. Energies.DOI
  26. 钟登华,沈子洋,王佳俊,崔博,任炳昱,王栋(2018). 基于实时监控的混凝土坝振捣施工质量动态评价研究. 《水利学报》.DOI
  27. 林威伟,钟登华,胡炜,吕鹏,鄢玉玲,任炳昱(2018). 基于随机森林算法的土石坝压实质量动态评价研究. 《水利学报》.DOI
  28. 钟登华,田耕,关涛,崔博,鄢玉玲(2018). 基于混沌时序-随机森林回归的堆石坝料加水量预测研究. 《水力发电学报》.
  29. 钟登华,吴含,吴斌平,张亦弛,岳攀(2018). 基于误差分析的水电工程坝基岩体三维裂隙网络动态模拟研究(英文). Journal of Central South University.
  30. 刘肖军,陈文龙,宋文帅,佟大威,任炳昱,钟登华(2018). 基于改进IDA的混凝土坝地震易损性研究. 《中国科学:技术科学》.
  31. 杜荣祥,钟登华,关涛,胡炜,王乾伟(2018). 考虑仓面实时监控厚度影响的堆石坝仓面施工仿真. 《天津大学学报(自然科学与工程技术版)》.
  32. 钟登华,王志宁,关涛,王栋,鄢玉玲(2018). 基于增强现实的心墙堆石坝施工进度可视化仿真. 《天津大学学报(自然科学与工程技术版)》.
  33. Jiajun Wang, Denghua Zhong, Hojjat Adeli, Dong Wang, Minghui Liu (2018). Smart bacteria‐foraging algorithm‐based customized kernel support vector regression and enhanced probabilistic neural network for compaction quality assessment and control of earth‐rock dam. Expert Systems.DOI
  34. Tao Guan, Denghua Zhong, Bingyu Ren, Wenshuai Song, Zhi-Qiang Chu (2018). Construction simulation of high arch dams based on fuzzy Bayesian updating algorithm. Journal of Zhejiang University. Science A.DOI
  35. Qian-wei Wang, Denghua Zhong, Binping Wu, Jia Yu, Haotian Chang (2018). Construction simulation approach of roller-compacted concrete dam based on real-time monitoring. Journal of Zhejiang University. Science A.DOI
  36. Fei Wang, Denghua Zhong, Yuling Yan, Bingyu Ren, Binping Wu (2018). Rockfill dam compaction quality evaluation based on cloud-fuzzy model. Journal of Zhejiang University. Science A.DOI
  37. Denghua Zhong, Han Wu, Binping Wu, Yichi Zhang, Pan Yue (2018). 3-D fracture network dynamic simulation based on error analysis in rock mass of dam foundation. Journal of Central South University.DOI
  38. Denghua Zhong, Xiaochao Li, Bo Cui, Binping Wu, Yuxi Liu (2018). Technology and application of real-time compaction quality monitoring for earth-rockfill dam construction in deep narrow valley. Automation in Construction.DOI
  39. Jiajun Wang, Denghua Zhong, Binping Wu, Mengnan Shi (2018). Evaluation of Compaction Quality Based on SVR with CFA: Case Study on Compaction Quality of Earth-Rock Dam. Journal of Computing in Civil Engineering.DOI
  40. Yichi Zhang, Denghua Zhong, Binping Wu, Tao Guan, Pan Yue, Han Wu (2018). 3D Parametric Modeling of Complex Geological Structures for Geotechnical Engineering of Dam Foundation Based on T‐Splines. Computer-Aided Civil and Infrastructure Engineering.DOI
  41. Denghua Zhong, Rongxiang Du, Bo Cui, Binping Wu, Tao Guan (2018). Real-Time Spreading Thickness Monitoring of High-core Rockfill Dam Based on K-nearest Neighbor Algorithm. Transactions of Tianjin University.DOI
  42. Xiao-Jun Liu, Deng-Hua Zhong, Da-Wei Tong, Zheng-Yin Zhou, Xue-Fei Ao, Wen-Qian Li (2018). Dynamic visualisation of storm surge flood routing based on three‐dimensional numerical simulation.DOI
  43. Xiao-Jun Liu, Wenlong Chen, Wen-Shuai Song, Da-Wei Tong, Bing-yu Ren, Deng-Hua Zhong (2018). Study on seismic vulnerability of concrete dams based on improved IDA. Scientia Sinica Technologica.DOI
  44. 钟登华,杜荣祥,关涛,胡炜,王佳俊(2017). 心墙堆石坝仓面施工进度动态控制. 《河海大学学报(自然科学版)》.
  45. 王乾伟,钟登华,佟大威,敖雪菲,王青松(2017). 基于数值模拟的注浆过程三维动态可视化. 《天津大学学报(自然科学与工程技术版)》.
  46. 李晓超,钟登华,任炳昱,邓韶辉,祝玉珊(2017). 基于模糊RES-云模型的坝基岩体可灌性评价研究. 《水利学报》.DOI
  47. 钟登华,鄢玉玲,崔博,吴斌平,胡炜,吕鹏(2017). 考虑压实质量影响的碾压混凝土坝层间结合质量动态评价研究. 《水利学报》.DOI
  48. 樊贵超,钟登华,任炳昱,吴含,李晓超(2017). 基于分形理论的坝基裂隙岩体注灰量与导水率关系研究. 《水利学报》.DOI
  49. 钟登华,闫玉亮,张隽,王飞(2017). 耦合改进PERT和BBNs的堆石坝施工进度风险分析. 《水利学报》.DOI
  50. 王乾伟,钟登华,鄢玉玲,时梦楠,任炳昱(2017). 基于熵权-D数模型的RCC坝施工方案优选研究. 《水力发电学报》.
  51. 钟登华,赵江浩,任炳昱,关涛,王飞(2017). 基于动态VIKOR扩展方法的混凝土重力坝施工方案多属性决策研究. 《水力发电学报》.
  52. 肖尧,钟登华,任炳昱,余佳,赵梦琦,区丽雯(2017). 基于CSRAM的引水隧洞施工进度风险分析. 《水力发电学报》.
  53. 钟登华,贾晓旭,杜成波,崔博,任炳昱,吴斌平(2017). 心墙堆石坝4D施工信息模型及应用. 《河海大学学报(自然科学版)》.
  54. Jun Zhang, Denghua Zhong, Binping Wu, Fei Lv, Bo Cui (2017). Earth Dam Construction Simulation Considering Stochastic Rainfall Impact. Computer-Aided Civil and Infrastructure Engineering.DOI
  55. Denghua Zhong, Zhen Wang, Yichi Zhang, Mengnan Shi (2017). Fluid–Solid Coupling Based on a Refined Fractured Rock Model and Stochastic Parameters: A Case Study of the Anti-Sliding Stability Analysis of the Xiangjiaba Project. Rock Mechanics and Rock Engineering.DOI
  56. Jia Yu, Denghua Zhong, Bingyu Ren, Dawei Tong, Kun Hong (2017). Probabilistic Risk Analysis of Diversion Tunnel Construction Simulation. Computer-Aided Civil and Infrastructure Engineering.DOI
  57. Denghua Zhong, Zhi-Qiang Chu, Bingyu Ren, Mengqi Zhao, Tao Guan, Wenshuai Song (2017). Global Comprehensive Sensitivity Analysis of Arch Dam Construction Parameters Based on Orthogonal Experiment. Transactions of Tianjin University.DOI
  58. Yue Pan, Denghua Zhong, Fugen Yan, Han Wu, Yichi Zhang (2017). 3-D Fracture Network Modelling in Hydropower Engineering Based on Optimal Monte Carlo Simulation. Transactions of Tianjin University.DOI
  59. Xiaochao Li, Denghua Zhong, Bingyu Ren, Guichao Fan, Bo Cui (2017). Prediction of curtain grouting efficiency based on ANFIS. Bulletin of Engineering Geology and the Environment.DOI
  60. Tao Guan, Denghua Zhong, Bingyu Ren (2017). Real-Time Update of Sequence Placement Logic for High Arch Dams Based on Evidence Weight Discount. Transactions of Tianjin University.DOI
  61. Denghua Zhong, Wei Hua Hu, Binping Wu, Zheng Li, Jun Zhang (2017). Dynamic time-cost-quality tradeoff of rockfill dam construction based on real-time monitoring. Journal of Zhejiang University. Science A.DOI
  62. Guichao Fan, Denghua Zhong, Fugen Yan, Pan Yue (2016). A hybrid fuzzy evaluation method for curtain grouting efficiency assessment based on an AHP method extended by D numbers. Expert Systems With Applications, Vol. 44.DOI
  63. 关涛,钟登华,任炳昱(2016). 基于随机占优度的高拱坝施工方案优化研究. 《水力发电学报》.
  64. 毕磊,钟登华,赵梦琦(2016). 基于均匀设计的地下洞室群施工进度仿真多因素敏感性分析. 《水力发电学报》.
  65. 吴斌平,岳攀,鄢玉玲,钟登华,刘昊元(2016). 考虑时间影响的神经网络组合模型对心墙堆石坝变形的预测研究. 《水力发电学报》.
  66. 沈扬,钟登华,李明超(2016). 复杂施工过程中碾压混凝土冷却水管移位与损坏分析及应用. 《水利水电技术(中英文)》.
  67. 岳攀,钟登华,吴含,张亦弛(2016). 基于LHS的坝基岩体三维裂隙网络模拟. 《水力发电学报》.
  68. 钟登华,张元坤,吴斌平,任炳昱(2016). 基于实时监控的碾压混凝土坝仓面施工仿真可视化分析. 《河海大学学报(自然科学版)》.
  69. 钟登华,关涛,任炳昱(2016). 基于改进重抽样法的高拱坝施工进度仿真研究. 《水利学报》.DOI
  70. Guichao Fan, Denghua Zhong, Bingyu Ren, Bo Cui, Xiaochao Li, Yue Pan (2016). Real-time grouting monitoring and visualization analysis system for dam foundation curtain grouting. Transactions of Tianjin University.DOI
  71. 钟登华,李正,吴斌平,胡炜,吕鹏(2016). 基于Pareto解的面板堆石坝施工工期-质量-成本均衡优化研究. 《天津大学学报(自然科学与工程技术版)》.
  72. 王振,钟登华,朱晓斌(2016). 基于EFAST法的地下洞室静动力稳定参数全局敏感性分析. 《天津大学学报(自然科学与工程技术版)》.
  73. 李文倩,佟大威,王振,鲁文妍,朱晓斌,钟登华(2016). 考虑黏结特性的水电地下洞室块体地震响应分析. 《天津大学学报(自然科学与工程技术版)》.
  74. Jiajun Wang, Denghua Zhong, Fei Wang (2016). Evaluation of compaction quality of earth-rock dam based on bacterial foraging-support vector regression algorithm.DOI
  75. Fei Wang, Jin Qiangguo, Denghua Zhong, Binping Wu (2016). Rock-fill Dam Construction Quality Evaluation Based on Combination Model. International Conference on Energy and Environmental Protection (ICEEP).DOI
  76. Qianwei Wang, Denghua Zhong, Jianghao Zhao (2016). Application of neural network model in construction quality evaluation of core wall rockfill dam. International Conference on Energy and Environmental Protection (ICEEP).DOI
  77. Bin-ping Wu, Pan Yue, Yu-ling Yan, Deng-Hua Zhong, Hao-Yuan Liu(2016). 時間的影響を考慮したニューラルネットワークモデルによるロックフィルダムの予測に関する研究【JST・京大機械翻訳】.
  78. 钟登华,石志超,杜荣祥,张胜利(2015). 基于CATIA的心墙堆石坝三维可视化交互系统. 《水利水电技术(中英文)》.
  79. 陈宁,钟登华,龚家明,刘东海(2015). 溧阳抽水蓄能电站面板堆石坝施工质量实时控制技术. 《水利水电技术(中英文)》.
  80. 关涛,任炳昱,王凤莲,钟登华(2015). 大岗山水电站高拱坝施工进度优化研究. 《水力发电》.
  81. 钟登华,王飞,吴斌平,崔博,刘玉玺(2015). 从数字大坝到智慧大坝. 《水力发电学报》.
  82. 王瑞,钟登华,吴斌平,岳攀(2015). 实时监控下考虑料源不确定性的堆石坝压实质量评估. 《水力发电学报》.
  83. 钟登华,程普,任炳昱,关涛,刘肖军(2015). 基于粒子群算法的高拱坝仓面排序多目标优化研究. 《水力发电学报》.
  84. 钟登华,翟海峰,崔博,吴斌平,毕磊(2015). 基于实时监控的沥青混凝土心墙坝坝面碾压施工仿真研究. 《水力发电学报》.
  85. 钟登华,杨士瑞,张琴娅,杜荣祥,常昊天(2015). 基于改进集对分析方法的高心墙堆石坝填筑工期仿真及风险评价. 《水力发电学报》.
  86. 钟登华,李超,孙蕊蕊,刘肖军,程正飞(2015). 长距离调水工程高填方渠道溃堤三维洪水演进情景仿真. 《水力发电学报》.
  87. 洪坤,赵梦琦,钟登华,余佳,毕磊(2015). 基于极差分析法的引水隧洞施工工期多因素灵敏度分析. 《水利水电技术(中英文)》.
  88. 钟登华,刘昊元,佟大威,刘玉玺,吴斌平,刘肖军(2015). 基于ANFIS-GM的心墙堆石坝变形预测. 《水利水电技术(中英文)》.
  89. 钟登华,张琴娅,杜荣祥,佟大威,石志超(2015). 基于CATIA的心墙堆石坝施工动态仿真. 《天津大学学报(自然科学与工程技术版)》.
  90. Rongxiang Du, Denghua Zhong, Jia Yu, Dawei Tong, Binping Wu (2015). Construction Simulation for a Core Rockfill Dam Based on Optimal Construction Stages and Zones: Case Study. Journal of Computing in Civil Engineering.DOI
  91. Denghua Zhong, Lei Bi, Jia Yu, Mengqi Zhao (2015). Robustness analysis of underground powerhouse construction simulation based on Markov Chain Monte Carlo method. Science China Technological Sciences.DOI
  92. Denghua Zhong, ShiRui Yang, Haotian Chang, Jia Yu, Fugen Yan (2015). Construction schedule risk analysis of high roller-compacted concrete dams based on improved CSRAM. Science China Technological Sciences.DOI
  93. Yue Pan, Denghua Zhong, Zhengjian Miao, Jia Yu (2015). Prediction of Dredging Productivity Using a Rock and Soil Classification Model. Journal of Waterway Port Coastal and Ocean Engineering.DOI
  94. Denghua Zhong (2015). Scene simulation of levee-breach flood routing for high embankment canals in long-distance water diversion project. Journal of Hydroelectric Engineering.
  95. Rui Wang, Deng-Hua Zhong, Yuan-Kun Zhang, Jia Yu, Ming-Cong Li (2015). A multidimensional information model for managing construction information.DOI
  96. Tao Guan, Deng-Hua Zhong, Bing-yu Ren, P. Cheng (2015). Construction schedule optimization for high arch dams based on real-time interactive simulation.DOI
  97. Deng-Hua Zhong, Lei Bi, Jia Yu, Meng-Qi Zhao, Kun Hong (2015). Range analysis-based multi-parameters sensitivity analysis on construction period of diversion tunnel.
  98. 毕磊,钟登华,胡连兴,任炳昱(2014). 基于数据包络分析的隧洞施工仿真多方案评价与优选. 《水力发电学报》.
  99. 钟登华,谷金操,佟大威(2014). 水电站厂房及设备可视化交互仿真建模方法与应用. 《天津大学学报(自然科学与工程技术版)》.
  100. 闫福根,钟登华,任炳昱,岳攀,樊贵超,李晓超(2014). 基于B/S结构的三维交互式灌浆可视化系统的研制及应用. 《水利水电技术(中英文)》.
  101. 王瑞,钟登华,张隽(2014). 基于数据立方体的水电工程建设项目群信息管理系统. 《水利水电技术(中英文)》.
  102. 刘序,崔博,钟登华,冀丰伟(2014). 梨园水电站上坝线路交通安全分析. 《水利水电技术(中英文)》.
  103. 刘玉玺,钟登华,崔博(2014). 基于实时监控的碾压混凝土VC值变化量预测模型研究. 《水力发电学报》.
  104. 钟登华,常峻,任炳昱,刘宁(2014). 基于实时监控的高堆石坝施工进度影响因素研究. 《水力发电学报》.
  105. 刘宁,佟大威,崔博,钟登华(2014). 基于监控与预测信息的掺砾土心墙堆石坝施工动态仿真系统研究. 《系统仿真学报》.
  106. 钟登华,鲁文妍,刘杰,佟大威(2014). 复杂地质条件下地下洞室曲面块体地震响应分析. 《天津大学学报(自然科学与工程技术版)》.
  107. Denghua Zhong, F. G. Yan, Mingchao Li, Chenrui Huang, K. Fan, J. F. Tang (2014). A Real-Time Analysis and Feedback System for Quality Control of Dam Foundation Grouting Engineering. Rock Mechanics and Rock Engineering.DOI
  108. Yuxi Liu, Denghua Zhong, Bo Cui, Guiliang Zhong, Yongxin Wei (2014). Study on real-time construction quality monitoring of storehouse surfaces for RCC dams. Automation in Construction.DOI
  109. Lei Bi, Bingyu Ren, Denghua Zhong, Lianxing Hu (2014). Real-Time Construction Schedule Analysis of Long-Distance Diversion Tunnels Based on Lithological Predictions Using a Markov Process. Journal of Construction Engineering and Management.DOI
  110. Denghua Zhong (2014). Study on influencing factors of construction progress of high rock-fill dam based on real-time monitoring. Journal of Hydroelectric Engineering.
  111. 缪正建,钟登华,李明超,高伟(2013). 疏浚工程土质三维建模与可视化分析系统. 《河海大学学报(自然科学版)》.
  112. 钟登华,常昊天,刘宁,张平(2013). 高堆石坝施工过程的仿真与优化. 《水利学报》.DOI
  113. 钟登华,崔博,钟桂良(2013). 高碾压混凝土坝施工实时控制系统理论与应用. 《大坝安全与新技术应用》.
  114. 吴斌平,崔博,任成功,钟登华(2013). 龙开口碾压混凝土坝浇筑碾压施工质量实时监控系统研究与应用. 《水利水电技术(中英文)》.
  115. 林达,李明超,佟大威,钟登华(2013). 溢洪道开挖边坡三维地质建模与稳定性分析及应用. 《岩石力学与工程学报》.
  116. 钟登华,陈永兴,常昊天,吴斌平(2013). 沥青混凝土心墙堆石坝施工仿真建模与可视化分析. 《天津大学学报(自然科学与工程技术版)》.
  117. 常昊天,钟登华,王双起,陈永兴(2013). 耦合动态合仓的碾压混凝土坝施工进度全过程仿真. 《天津大学学报(自然科学与工程技术版)》.
  118. 吴斌平,任炳昱,钟登华(2013). 基于边缘优先和空间冲突的拱坝浇筑仿真研究. 《系统仿真学报》.
  119. Denghua Zhong, XiaoXin Zhang, Xuefei Ao, Xiaoling Wang, Dawei Tong, Bingyu Ren (2013). Study on coupled 3D seepage and stress fields of the complex channel project. Science China Technological Sciences.DOI
  120. Denghua Zhong, Bin Yang, Wenqian Li, Donghai Liu, Dawei Tong (2013). Application of three-dimensional visual simulation in tidal defense engineering. Transactions of Tianjin University.DOI
  121. Denghua Zhong (2013). Research of Construction Simulation for Arch Dam Based on Margin-priority Principal and Spatial Conflicts. Jisuanji fangzhen.
  122. Zhong Deng-hua (2013). Development Status and Trend of Chinese Water Industry. China Water & Wastewater.
  123. Yuefeng Sun, Haotian Chang, Zhengjian Miao, Denghua Zhong (2012). Solution method of overtopping risk model for earth dams. Safety Science, Vol. 50, No. 9.DOI
  124. 赵晨生,钟登华(2012). 耦合质量要素的高心墙堆石坝施工仿真理论与应用. 《水利水电技术(中英文)》.
  125. 钟登华,刘宁,崔博(2012). 基于数字监控的高心墙堆石坝施工场内交通仿真研究. 《水力发电学报》.
  126. 钟桂良,崔博,刘磊,钟登华(2012). 碾压混凝土坝施工气候信息实时监控理论与应用. 《水利水电技术(中英文)》.
  127. 刘宁,钟登华,张平(2012). 高心墙堆石坝施工现场交通可视化仿真研究. 《水利水电技术(中英文)》.
  128. Donghai Liu, Bo Cui, Yugang Liu, Denghua Zhong (2012). Automatic control and real-time monitoring system for earth–rock dam material truck watering. Automation in Construction.DOI
  129. Zhengjian Miao, Mingchao Li, Denghua Zhong (2012). Automatic generation method of geological cross-sections in dredging engineering based on 3D solid NURBS models. Transactions of Tianjin University.DOI
  130. Ning Liu, Bo Cui, Denghua Zhong (2012). Fuzzy earthwork dynamic allocation and optimization for construction of high concrete face Rockfill dam. Transactions of Tianjin University.DOI
  131. Denghua Zhong, Wenqian Li, Rui Wang, Zhengjian Miao, Dawei Tong (2012). Three-dimensional visual analysis for construction layout of reservoir project. Transactions of Tianjin University.DOI
  132. Bo Cui, Denghua Zhong (2012). Theory and application of system integration for real-time monitoring of core rock-fill dam filling construction quality. Transactions of Tianjin University.DOI
  133. Zhengjian Miao, Mingchao Li, Denghua Zhong (2012). Numerical calculation of channel dredging volume using 3D digital stratum model. Transactions of Tianjin University.DOI
  134. Fugen Yan, Zhengjian Miao, Mingchao Li, Denghua Zhong (2012). Visual analysis for grouting engineering of dam foundation based on 3D geological model. Chinese Journal of Geotechnical Engineering.
  135. Denghua Zhong (2012). Theory and application of construction simulation coupled with quality factors for high core rock-fill dam. Water Resources and Hydropower Engineering.
  136. 钟登华,马洪琪 钟登华 张宗亮 孙玉军 刘东海(2011). 重大水利水电工程施工实时控制关键技术及其工程应用. 《中国工程科学》, Vol. 13, No. 12.下载原文
  137. 钟登华(2011). 水利工程仿真与安全. 《科技导报》.
  138. 钟登华,钟登华 赵晨生 张平(2011). 高心墙堆石坝坝面碾压施工仿真理论与应用. 《中国工程科学》, Vol. 13, No. 12.下载原文
  139. Donghai Liu, Jing Gong Sun, Denghua Zhong, Lingguang Song (2011). Compaction Quality Control of Earth-Rock Dam Construction Using Real-Time Field Operation Data. Journal of Construction Engineering and Management.DOI
  140. Denghua Zhong, ChenSheng Zhao, Bingyu Ren (2011). Research on analysis method for temperature control information of high arch dam construction. Science China Technological Sciences.DOI
  141. Guiliang Zhong, Bo Cui, Denghua Zhong (2011). Auto identification of rolling layers in roller-compacted concrete dam. Transactions of Tianjin University.DOI
  142. Denghua Zhong, Donghai Liu, Bo Cui (2011). Real-time compaction quality monitoring of high core rockfill dam. Science China Technological Sciences.DOI
  143. Denghua Zhong, Yuefeng Sun, Mingchao Li (2011). Dam break threshold value and risk probability assessment for an earth dam. Natural Hazards.DOI
  144. 钟登华,崔博,蔡绍宽(2010). 面向EPC总承包商的水电工程建设项目信息集成管理. 《水力发电学报》.
  145. 钟登华,李明超 钟登华 王忠耀 刘杰(2010). 水利水电工程地质-水工三维协同设计系统研究. 《中国工程科学》, No. 1.下载原文
  146. Lianxing Hu, Denghua Zhong (2010). Research on network scheduling planning technique based on system simulation. IEEE International Conference on Progress in Informatics and Computing.DOI
  147. Yuefeng Sun, Denghua Zhong, Mingchao Li, Ying Li (2010). Theory and application of loss of life risk analysis for dam break. Transactions of Tianjin University.DOI
  148. Denghua Zhong, Bingyu Ren, Mingchao Li, Binping Wu, MingChuan Li (2010). Theory on real-time control of construction quality and progress and its application to high arc dam. Science China Technological Sciences.DOI
  149. 赵川,吴敏,沈嗣元,李小联,谷涛,钟登华,吴刚(2009). 堆石坝填筑质量GPS监控及附加质量法检测密度技术. 《云南水力发电》.
  150. 钟登华,刘勇,黄伟,李明超(2009). 水利水电工程施工水流控制过程的仿真与优化方法. 《中国科学:技术科学》.
  151. 钟登华,张平(2009). 基于实时监控的高心墙堆石坝施工仿真理论与应用. 《水利水电技术(中英文)》.
  152. 钟登华,郭享(2009). 水电工程地下主厂房三维参数化设计方法. 《水力发电学报》.
  153. Denghua Zhong, Bo Cui, Donghai Liu, Dawei Tong (2009). Theoretical research on construction quality real-time monitoring and system integration of core rockfill dam. Science China Technological Sciences.DOI
  154. Xinfeng Wang, Denghua Zhong (2009). Study on Multi-Objective Decision-Making for Planning of Land Reclamation. International Conference on Management and Service Science (MASS).DOI
  155. Denghua Zhong, Mingchao Li, Huang Wei, Yong Liu (2009). Dynamic simulation and optimization approach to construction diversion of hydraulic and hydroelectric projects. Science China Technological Sciences.DOI
  156. Denghua Zhong, Dawei Tong (2009). 3D finite element simulation of tunnel boring machine construction processes in deep water conveyance tunnel. Transactions of Tianjin University.DOI
  157. Bo Cui, Deng-Hua Zhong, Ping Zhang, Lei Liu (2009). The Application of Computer Graphic Technology on Monitoring Roller Compaction Quality of Rock-fill Dam. 2009 Sixth International Conference on Computer Graphics, Imaging and Visualization.DOI
  158. 钟登华,郑家祥,黄伟,宋洋(2008). 面向结构图的分汊河道截流过程仿真与优化研究. 《2008中国水力发电论文集》.
  159. 徐长义,钟登华,曹广晶(2008). 基于随机赋权法的水电项目综合评价方法及其应用. 《河海大学学报(自然科学版)》.
  160. 钟登华,蔡绍宽,李玉钦(2008). 基于网络分析法(ANP)的水电工程风险分析及其应用. 《水力发电学报》.
  161. 宋海良,宋洋,钟登华,钟炜(2008). 基于GIS的小波神经网络库区径流预报模型研究. 《水力发电学报》.
  162. 钟登华,肖智旺 钟登华(2008). 基于RBF神经网络算法的连拱隧道围岩变形预测方法研究. 《中国工程科学》, Vol. 10, No. 7.下载原文
  163. Denghua Zhong, Jie Liu, Mingchao Li, Caiwei Hao (2008). NURBS reconstruction of digital terrain for hydropower engineering based on TIN model. Progress in Natural Science Materials International.DOI
  164. Denghua Zhong, Bingyu Ren, WU Kang-xin (2008). Construction simulation and real-time control for high arch dam. Transactions of Tianjin University.DOI
  165. Denghua Zhong, Jianmin Liu, Kaizhi Xiong, Jinqiang Fu (2008). Visual dynamic simulation and optimization of Zhangjiuhe diversion project. Transactions of Tianjin University.DOI
  166. 宋洋,钟登华,段文泉(2007). 基于VR的水电站调度三维图形仿真研究. 《系统仿真学报》.
  167. 钟登华,刘杰,李明超,王刚(2007). 基于三维地质模型的大型地下洞室群布置优化研究. 《水利学报》.DOI
  168. 宋洋,钟登华,钟炜,何伟(2007). 面向电力市场的梯级水电站联合优化调度研究. 《水力发电学报》.
  169. 钟登华,张发瑜,李明超,付金强(2007). 面向对象的堆石坝施工系统仿真与优化研究. 《水力发电》.
  170. 张宗亮,钟登华,宋洋,何伟(2007). 基于B/S结构的梯级水电站优化调度系统研究. 《第三届全国水力学与水利信息学大会论文集》.
  171. 钟登华,李明超,刘杰(2007). 水利水电工程地质三维统一建模方法研究. 《中国科学:技术科学》.
  172. Denghua Zhong, Ping Zhang, WU Kang-xin (2007). Theory and practice of construction simulation for high rockfill dam. Science China Technological Sciences.DOI
  173. Denghua Zhong, Mingchao Li, Jie Liu (2007). 3D integrated modeling approach to geo-engineering objects of hydraulic and hydroelectric projects. Science China Technological Sciences.DOI
  174. Denghua Zhong (2007). Three-dimensional visualized analysis and application of geological information of large underground cavern groups. Shuili shuidian ke-ji jinzhan.
  175. Deng-Hua Zhong (2007). Analysis of Joint Checkup Procedure on Preliminary Design of Auxiliary Equipment in Jililong First Cascade Hydropower Plant.
  176. 钟登华(2006). 水利水电工程地质三维建模与分析理论及实践 = Theories and Applications of 3D Engineering-Geological Modeling and Analyusis to Hydraulic and Hydroelectric Projects. 《中国水利水电出版社》.
  177. 李景茹,钟登华,刘东海,胡程顺(2006). 水利水电工程三维动态可视化仿真技术与应用. 《系统仿真学报》.
  178. 钟登华,黄伟,安娜(2006). 基于Monte-Carlo方法的施工截流风险率估计方法研究. 《水利学报》.DOI
  179. 钟登华,钟登华 张成 宋洋(2006). 基于可视化仿真的水电工程动态信息管理与控制方法. 《中国工程科学》, Vol. 8, No. 2.下载原文
  180. 宋洋,钟登华(2006). 基于可视化仿真的水电工程施工进度分析与控制研究. 《系统工程理论与实践》, Vol. 26, No. 8.下载原文
  181. 钟登华,陈耀明 钟登华 付金强(2006). 基于遗传算法的工程项目投资综合优化探讨. 《中国工程科学》, Vol. 8, No. 7.下载原文
  182. Denghua Zhong, Mingchao Li, Lingguang Song, Gang Wang (2006). Enhanced NURBS modeling and visualization for large 3D geoengineering applications: An example from the Jinping first-level hydropower engineering project, China. Computers & Geosciences.DOI
  183. Denghua Zhong (2006). Study on Construction Schedule Management and Control Method for Hydraulic & Hydropower Engineering Based on Visual Simulation. Systems Engineering - Theory & Practice.
  184. Zhong Deng-hua (2006). Optimization of Multi-Resource Balance Considering Time Value of Funds. Journal of Tianjin University Science and Technology.
  185. Deng-Hua Zhong, Jie Liu, Mingchao Li (2006). An approach to 3D NURBS modeling of complex fault network considering its historic tectonics.DOI
  186. Deng-Hua Zhong (2006). Commissioning of Speed Governing System of No.1 Generator of Expansion Project of Huanglongtan Hydro-power Plant.
  187. 刘建民,钟登华,徐兴中,高博(2005). 南水北调中线枢纽工程施工可视化信息管理系统研究. 《水利水电技术(中英文)》.
  188. 练继亮,钟登华(2005). 混凝土坝施工仿真多目标评判理论与方法. 《水力发电学报》.
  189. 练继亮,钟登华(2005). 基于随机影响的仿真结果模糊综合评判. 《水力发电学报》.
  190. 钟登华,杨晓刚,李景茹(2005). 长隧洞TBM施工全过程仿真优化研究. 《水利水电技术(中英文)》.
  191. 张静,江新强,钟登华,胡程顺(2005). 三板溪混凝土面板堆石坝前期施工组织设计的关键环节. 《水电站设计》.
  192. 刘东海,崔广涛,钟登华,彭文怀(2005). 泄洪雾化的粒子系统模拟及三维可视化. 《水利学报》.DOI
  193. 钟登华,刘勇,宋洋(2005). 水电工程可视化动态管理信息系统研究. 《中国农村水利水电》.
  194. 陈耀明,钟登华(2005). 水利水电工程招标模糊综合评判方法探讨. 《中国农村水利水电》.
  195. 钟登华,钟登华 李明超 王刚 郭享 吴康新(2005). 水利水电工程三维数字地形建模与分析. 《中国工程科学》, Vol. 7, No. 7.下载原文
  196. 钟登华,李景茹 钟登华(2005). 基于GIS的混凝土坝施工可视化仿真技术及其应用. 《中国工程科学》, Vol. 7, No. 8.下载原文
  197. 钟登华,钟登华 刘建民 熊开智(2005). 复杂长距离输水系统仿真优化研究. 《中国工程科学》, Vol. 7, No. 10.下载原文
  198. 钟登华,刘奎建,杨晓刚(2005). 施工进度计划柔性网络仿真的不确定性研究. 《系统工程理论与实践》, Vol. 25, No. 2.下载原文
  199. Jingru Li, Denghua Zhong (2005). A GIS-Based Visual Simulation System for Underground Power Station Construction. ASCE International Conference on Computing in Civil Engineering (i3CE).DOI
  200. Denghua Zhong, Mingchao Li, Gang Wang, Huang Wei (2005). NURBS-Based 3D Graphical Modeling and Visualization of Geological Structures. International Conference on Image and Graphics.DOI
  201. Deng-Hua Zhong (2005). Cause Analysis and Treatment of GXT Type Runaway Governor Fault.
  202. Deng-Hua Zhong (2005). Analysis of Installation and Commissioning of Generating Set for Expansion Project in Huanglongtan Power Plant.
  203. Denghua Zhong (2005). Study on simulation and optimization of tunneling with TBM for long tunnel.
  204. 钟登华,宋洋(2004). 基于GIS的水利水电工程三维可视化图形仿真方法与应用. 《图学学报》.
  205. 钟登华,熊开智,崔广涛,成立芹(2004). 输水系统非正常调节时的动态仿真研究. 《水利学报》.DOI
  206. 钟登华,宋洋(2004). 大型水利工程三维可视化仿真方法研究. 《计算机辅助设计与图形学学报》.
  207. 王振强,钟登华(2004). 大型水利工程项目投资风险分析方法. 《水利学报》.
  208. 钟登华,黄伟,朱慧蓉(2004). 施工导流过程三维动态可视化图形仿真研究. 《水利水电技术(中英文)》.
  209. 钟登华,胡程顺,张静(2004). 高土石坝施工系统可视化仿真与应用研究. 《水利水电技术(中英文)》.
  210. 王振强,钟登华(2004). 工程项目财务风险分析方法及在大型水电站项目中的应用研究. 《水力发电学报》.
  211. 钟登华,段文泉,宋洋,南春晖,郭享(2004). 水电工程可视化动态信息管理系统研究. 《水力发电学报》.
  212. 曹广晶,钟登华,胡程顺(2004). 三峡工程碾压混凝土围堰施工若干重大技术问题研究. 《水力发电学报》.
  213. 郑家祥,钟登华,胡程顺,郭勇(2004). 沙牌拱坝碾压混凝土浇筑中的关键技术研究. 《水力发电学报》.
  214. 钟登华,刘奎建,张静(2004). 大型地下洞室群施工动态可视化仿真研究进展. 《水力发电学报》.
  215. 朱慧蓉,钟登华(2004). 施工总布置三维可视化数字模型研究. 《计算机工程与设计》.
  216. 钟登华,张静,胡程顺(2004). 堆石坝施工组织的计算机辅助设计研究. 《水力发电》.
  217. 钟登华,刘东海 钟登华 李明超(2004). 水电工程地质信息三维可视化与分析. 《中国工程科学》, Vol. 6, No. 5.下载原文
  218. Denghua Zhong, Jingru Li, Huirong Zhu, Lingguang Song (2004). Geographic Information System-Based Visual Simulation Methodology and Its Application in Concrete Dam Construction Processes. Journal of Construction Engineering and Management.DOI
  219. Denghua Zhong, Kuijian Liu, Mingchao Li (2004). GIS-based 3D dynamic visualization of simulated complex construction process. Proceedings of SPIE, the International Society for Optical Engineering/Proceedings of SPIE.DOI
  220. Donghai Liu, Denghua Zhong, Huirong Zhu (2004). Visual computer-aided design and analysis with dynamic simulation for hydroelectric project construction. Proceedings of SPIE, the International Society for Optical Engineering/Proceedings of SPIE.DOI
  221. Denghua Zhong, Kaizhi Xiong, Liqin Cheng (2004). Actuality and prospect of visual numerical simulation in water diversion systems. Proceedings of SPIE, the International Society for Optical Engineering/Proceedings of SPIE.DOI
  222. Denghua Zhong, Liqin Cheng, Kaizhi Xiong, Jing Meng (2004). Application study of dynamic simulation in water transport system. Proceedings of SPIE, the International Society for Optical Engineering/Proceedings of SPIE.DOI
  223. Denghua Zhong, HU Cheng-shun, Jing Zhang (2004). GIS-based visualization for earth allocation in hydroelectric engineering. Proceedings of SPIE, the International Society for Optical Engineering/Proceedings of SPIE.DOI
  224. Deng-Hua Zhong (2004). UML-based analysis and design on environment spatial decision-making support system.
  225. Cheng-Shun Hu, Jing Zhang, Deng-Hua Zhong, Xin-Qiang Jiang (2004). Study and application of simulation to Sanbanxi CFRD construction.DOI
  226. Mingchao Li, Gang Wang, Deng-Hua Zhong (2004). Visual analysis of rock mass classification in high arch dam foundation and its application.DOI
  227. 阎俊爱,钟登华,李永林(2003). 城市防洪减灾非工程措施的研究与展望. 《水利水电技术(中英文)》.
  228. 钟登华,宋洋,宋彦刚,邓良胜(2003). 大型水利水电工程建筑物三维可视化建模技术研究. 《水利水电技术(中英文)》.
  229. 阎俊爱,钟登华(2003). 基于遗传算法的神经网络优化预测模型及其在年径流预报中的应用. 《水利水电技术(中英文)》.
  230. 钟登华,练继亮(2003). 大坝仿真计算中机械浇筑强度分析与优化研究. 《水利水电技术(中英文)》.
  231. 刘东海,钟登华(2003). 基于GIS的水电工程可视化辅助设计理论与方法. 《水利水电技术(中英文)》.
  232. 钟登华,练继亮(2003). 水利水电工程仿真系统可信性评估研究. 《水力发电学报》.
  233. 钟登华,毛寨汉(2003). 床面起伏影响下截流抛石稳定研究. 《水力发电学报》.
  234. 钟登华,李景茹,黄河,刘东海,张伟波,胡程顺,周锐,曹楚生,郑家祥(2003). 可视化仿真技术及其在水利水电工程中的应用研究. 《中国水利》.
  235. 钟登华,朱慧蓉,刘东海,毛寨汉(2003). GIS在水利水电工程建设中的应用与展望. 《中国水利》.
  236. 钟登华,冯志军,张伟波(2003). 大型水利工程施工交通运输系统仿真与可视化研究. 《系统仿真学报》.
  237. 钟登华,朱慧蓉,刘东海,毛寨汉(2003). GIS在水利水电工程可视化仿真研究中的应用. 《水利水电科技进展》.
  238. 钟登华,冯志军,毛寨汉(2003). 基于最大龙口流速指标的立堵截流施工风险随机模拟研究. 《水利学报》.DOI
  239. 钟登华,朱慧蓉,黄伟(2003). 水利工程施工总布置动态信息可视化方法研究. 《水利学报》.DOI
  240. 钟登华,刘东海,郑家祥(2003). 基于GIS的水电工程施工动态可视化仿真方法及其应用. 《水利学报》.
  241. 钟登华,周锐,刘东海(2003). 水利水电工程施工系统三维建模与仿真. 《计算机仿真》.
  242. 钟登华,宋洋,刘东海,李景茹(2003). 大型引水工程施工三维可视化仿真系统研究. 《系统工程理论与实践》, Vol. 23, No. 11.下载原文
  243. 钟登华,钟登华 朱慧蓉 郑家祥(2003). 溪洛渡施工总布置三维动态可视化图形仿真研究. 《中国工程科学》, Vol. 5, No. 11.下载原文
  244. 李景茹,钟登华,刘志新,吴晓光(2003). 混凝土坝施工三维动态可视化仿真与优化. 《系统工程理论与实践》, Vol. 23, No. 7.下载原文
  245. 钟登华,胡程顺 钟登华 张静 洪文 李明超(2003). 土石方动态调配模型与可视化研究. 《中国工程科学》, Vol. 5, No. 12.下载原文
  246. 钟登华,练继亮,张宗亮,李仕琦,朱慧蓉(2003). 混凝土坝浇筑过程的仿真计算可视化研究. 《系统工程理论与实践》, Vol. 23, No. 6.下载原文
  247. 钟登华,刘东海,郑家祥(2003). 基于GIS的混凝土坝施工三维动态可视化仿真研究. 《系统工程理论与实践》, Vol. 23, No. 5.下载原文
  248. 钟登华,钟登华 熊开智 成立芹(2003). 遗传算法的改进及其在水库优化调度中的应用研究. 《中国工程科学》, Vol. 5, No. 9.下载原文
  249. 宋彦刚,邓良胜,钟登华,宋洋,张伟波(2002). 紫坪铺工程三维可视化图形仿真系统研究. 《水利水电技术(中英文)》.
  250. 钟登华,毛寨汉,刘东海(2002). 施工导流方案的多目标总体综合评价方法. 《水利水电技术(中英文)》.
  251. 钟登华,李景茹,郑家祥(2002). 全过程动态仿真技术及其在水利水电工程施工中的应用. 《水利水电技术(中英文)》.
  252. 钟登华,段文泉,张伟波,郑家祥(2002). 可视化动态仿真技术及其应用. 《系统工程理论与实践》, Vol. 22, No. 8.下载原文
  253. 张伟波,黄河,李景茹,杨庆学,钟登华(2002). 复杂地下洞室群施工系统仿真与进度研究. 《系统工程理论与实践》, Vol. 22, No. 3.下载原文
  254. 钟登华,刘东海(2001). 基于GIS的施工导流管理决策支持系统. 《水力发电》.
  255. 曹广晶,成立芹,钟登华(2001). 三峡电站水电调度优化探讨. 《水利水电技术(中英文)》.
  256. 刘东海,钟登华,叶玉珍(2001). 基于日径流模拟的围堰实时挡水风险率估计. 《水利学报》.
  257. 钟登华,宋洋,李景茹(2001). 基于GIS的复杂工程施工可视化信息管理系统. 《水利水电技术(中英文)》.
  258. 钟登华,张伟波,郑家祥(2001). 大型地下洞室群施工系统仿真. 《水利学报》.
  259. 钟登华,毛寨汉,朱慧蓉,周锐(2001). 水利水电工程土石方开挖可视化设计方法初探. 《水利水电技术(中英文)》.
  260. 戚蓝,郭磊,盖高,钟登华(2001). 倒虹吸管结构计算智能分析方法研究. 《水利水电技术(中英文)》.
  261. 戚蓝,马斌,钟登华(2001). 断层错位影响下输水管道结构分析. 《水利水电技术(中英文)》.
  262. 钟登华,熊小平,冯志军,刘东海,郑家祥,黎鸣(2001). 水利水电工程施工场地总布置可视化动态演示系统研究. 《水利水电技术(中英文)》.
  263. 钟登华,张伟波,郑家祥(2000). 复杂地下洞室群施工动态演示系统研究. 《水力发电》.
  264. 钟登华,刘东海(2000). 基于遗传逄法的施工导流建筑物优化. 《系统工程理论与实践》, Vol. 20, No. 10.下载原文
  265. 钟登华,刘东海,米子明(1999). 施工导流建筑物优化退火遗传算法. 《水利水电技术(中英文)》.
  266. 石明华,钟登华(1998). 施工导流超标洪水风险率估计的水文模拟方法. 《水利学报》.DOI
  267. 钟登华,黄凌,米子明,宋令广(1998). 于桥水库汛期入库水量预报神经网络方法. 《管理科学学报》, Vol. 1, No. 3.下载原文
  268. 钟登华,周钧平,林鸿镁(1997). 碾压混凝土施工运输方案选择专家系统. 《水利水电技术(中英文)》.
  269. 查京民,朱光熙,王仁超,钟登华(1994). 水利工程施工进度控制问题研究. 《水利水电技术(中英文)》.
  270. 钟登华,孙锡衡(1994). 循环网络模拟技术. 《系统工程理论与实践》, Vol. 14, No. 2.下载原文
  271. 钟登华,刘豹(1994). 非线性模型误差相关诊断的Z检验方法. 《管理工程学报》, Vol. 8, No. 4.下载原文
  272. 罗汉明,钟登华(1992). 导流隧洞断面选择的模糊层次分析法. 《水利学报》.
  273. 钟登华,罗汉明(1992). 锦江水电站导流隧洞断面选择研究. 《天津大学学报(自然科学与工程技术版)》.
  274. 孙锡衡,钟登华(1990). 水工隧洞施工过程的计算机模拟和施工方案优选. 《水利水电技术(中英文)》.
  275. 孙锡衡,钟登华,朱光熙(1988). 循环运行网络的原理及应用. 《中国管理科学》, No. 1.下载原文

书籍章节

  1. Denghua Zhong, Nengming Hu, Zhengfei Cheng, Peng Lü, Dawei Tong (2016). 3D finite element analysis of TBM water diversion tunnel segment coupled with seepage field. Transactions of Tianjin University.DOI

此主页由公开资料整理,尚未经学者本人认领。