Pengzhan Li, Tianjue Zhang, Jun Lin, Huai-Dong Xie, Gao-feng Pan, Xiao-Feng Zhu, Su-Ping Zhang, Zhaojun Jin, Xianlu Jia (2026). Symmetric cavity design and commissioning for high intensity proton cyclotron. Journal of Instrumentation.DOI
Ao-Xuan Ding, Zhu-Jie Nong, Xianlu Jia, He Zhang, Pengzhan Li, Cong Wu, Xia Zheng, B. Ji, Xin-Qi Jia, Lipeng Wen, Yuan-Yuan Yu, Huai-Dong Xie, Jian-sheng Xing, Guangda Yang, Xiao-Feng Zhu, Gao-feng Pan, Jia Zhou, Jing-Yuan Liu, F. Guan, Z. Yin, Chuan Wang, Su-Ping Zhang, G. Song, S. An, Tianjue Zhang (2026). Ignition of the RF-driven negative hydrogen (H-) ion source prototype at China Institute of Atomic Energy (CIAE) and its first 100-mA scale pulsed beam. Nuclear Instruments and Methods in Physics Research Section A : Accelerators, Spectrometers, Detectors and Associated Equipment.DOI
Chuan-Ye Liu, Qian-Kun Guo, Zi-Shen Wang, Z. Yin, Chuan Wang, Tianjue Zhang (2026). Development of a multi-mode time-dependent Monte Carlo framework for dynamic pencil beam scanning proton therapy using OpenTOPAS. Radiation Physics and Chemistry.DOI
Xi Wang, Jun Lin, Wei Fu, Chuan Wang, Tianjue Zhang (2026). Structural design and fabrication of the main magnet for multi-particle cyclotron. Journal of Physics, Conference Series.DOI
Ling Qin, Tianjue Zhang, Yunlong Chai, Wei Fu, Chuan Wang, Hong-Wei Wang (2026). Design of an electrostatic deflector of an ultra-compact superconducting cyclotron. 2026 7th International Conference on Electrical Technology and Automatic Control (ICETAC).DOI
Xiao-Feng Zhu, Su-Ping Zhang, Ning Zhang, Hong-Ji Zhou, Chuanshou Wang, Gao-feng Pan, Pengzhan Li, Yang Wang, Tianjue Zhang (2026). Technology for enhancing critical current of YBCO superconducting tapes via proton irradiation. Acta Physica Sinica.DOI
Xiao-Feng Zhu, Su-Ping Zhang, Ning Zhang, Hong-Ji Zhou, Chuan Wang, Gao-feng Pan, Pengzhan Li, Yang Wang, Tianjue Zhang (2026). Research on critical current enhancement technology for YBCO superconducting tapes based on Proton irradiation. Acta Physica Sinica.DOI
Z. Yin, Rui Xiong, Qian-Kun Guo, Chuan-Ye Liu, Tianjue Zhang, Chuan Wang, Bohan Zhao, Yongjun Ma (2025). Online Parameter Identification and Control in the Commissioning of Nozzle for CIAE Proton Therapy System. IEEE Transactions on Nuclear Science.DOI
Yang Wang, Z. Yin, Tianjue Zhang, Bohan Zhao, Chuan Wang, Tianyi Jiang, Qian-Kun Guo, Chuan-Ye Liu, Peng Zhu (2025). Development and Commissioning of the Beam Diagnostics for CIAE Proton Therapy Beamline System. IEEE Transactions on Nuclear Science.DOI
Tianjue Zhang, Chuan Wang, Z. Yin, Xianlu Jia, Yang Wang, Wei Fu, Jing-Yuan Liu, Zhaojun Jin, Hong-Ji Zhou, Su-Ping Zhang, Hongru Cai, Gao-feng Pan, Xiao-Feng Zhu, Jun Lin, Bohan Zhao, Qian-Kun Guo, Chuan-Ye Liu, Rui Xiong, Aolai He, Tianyi Jiang, Min Hu, Qiqi Song, Ao-Xuan Ding, Shang-Rui Jiang, Ping Liu, Fang Yang, Xie-Qing Huang, Zhichao Chu, Xiaoxue Xia, Zhe-Yuan Zhang, Ling Qin, Yongjun Ma, Ziyi Cheng, Zheng Xu, H. Le, You-Wen Zhang, Xi Wang, Zhan Liu (2025). The Beam Commissioning of SC Cyclotron-Based Proton Therapy System With Fast Energy Selection and Precise Gantry. IEEE Transactions on Nuclear Science.DOI
Qiqi Song, Aolai He, Bohan Zhao, Tianjue Zhang, Z. Yin, Chuan Wang (2025). Design and Tuning of a Fast Beam Energy Selection Control System for CYCIAE-230 Cyclotron Beamline. IEEE Transactions on Nuclear Science.DOI
Hong-Ji Zhou, Wei Fu, Chuan Wang, Xiao-Feng Zhu, Jing-Yuan Liu, Su-Ping Zhang, Tianjue Zhang (2025). Design of the cryogenic system of the CYCIAE-2000 MeV superconducting magnet. IOP Conference Series: Materials Science and Engineering.DOI
Tianjue Zhang, Xianlu Jia, G. Song, Z. Yin, Pengzhan Li, Bin Ji, Ming Li, Shigang Hou, Gao-feng Pan, F. Guan, Jingfeng Wang, Hekun Zhang, Jing-Yuan Liu, Jian-sheng Xing, Hongru Cai(2023). 型谱化高流强质子回旋加速器自主研发及创新应用. Chinese Science Bulletin.DOI
Tianjue Zhang, Wei Fu, Chuan Wang, S. Pei, Z. Yin, Hongji Zhou, Ziye Yin, Su-Ping Zhang, Jing-Yuan Liu, Xiao-Feng Zhu, Fei Wang, Yang Wang, Hongru Cai, Gao-feng Pan, Xueer Mu, Jun Lin, Bo Zhao, Aolai He, Zhichao Chu, Ming-Kai Hu, Qiqi Song (2023). Innovative research and development activities on high energy and high current isochronous proton accelerator. Journal of Instrumentation.DOI
P. Huang, Z. Yin, Tian-Jian Bian, Shigang Hou, F. Guan, S. An, Yang Wang, Tianjue Zhang, Lu-Yu Ji, Lipeng Wen, Xueer Mu (2023). Design of the offline test electronics for the nozzle system of proton therapy. Scientific Reports.DOI
Tian-Jian Bian, Tianjue Zhang, Ming Li, Chuan Wang, Wei Fu, S. An, Su-Min Wei, Fei Wang (2022). Possible solution for the integer resonance crossing problem of GeV-class isochronous Fixed-Field Alternating Gradient accelerators. Nuclear Instruments and Methods in Physics Research Section A : Accelerators, Spectrometers, Detectors and Associated Equipment.DOI
Pengzhan Li, Tianjue Zhang, Bin Ji, M. Yin, Ming Li, Juanjuan Guo, Xianlu Jia, Jun Lin, G. Song, Shigang Hou, Gao-feng Pan, Z. Yin (2022). Research on frequency modulation technology and its verifications of superconducting synchrocyclotron for cancer therapy. Journal of Nuclear Science and Technology.DOI
Leilei Guan, Ming Li, Fei Wang, Su-Min Wei, S. Pei, S. An, Z. Yin, Tianjue Zhang (2022). Coupling Design of Combined Function Bending Magnet and High Current Electron Beam for 100 kW Irradiation Accelerator. IEEE transactions on applied superconductivity.DOI
Pengzhan Li, Tianjue Zhang, Xianlu Jia, Bin Ji, G. Song, Ming Li, Jun-Yi Wei (2022). Development of Bunching System for High Intensity Cyclotron at CIAE. Journal of Nuclear Science and Technology.DOI
Wei Fu, Chuan Wang, Tianjue Zhang, Hongji Zhou, Jun Lin, Ming Li, Tian-Jian Bian, Su-Ping Zhang, Xiao-Feng Zhu, S. An (2022). Fabrication and Test of a 1:4 Scaled HTS Coil for the Defocusing Magnet of 2 GeV FFAG Accelerator. IEEE transactions on applied superconductivity.DOI
Xiao-Liang Fu, Z. Yin, K. Fong, Tianjue Zhang, Jun-Yi Wei, B. Ji, F. Guan, Xiao-Tong Lu, Yang Wang (2021). LLRF Controller for High Current Cyclotron-Based BNCT System. IEEE Transactions on Nuclear Science.DOI
P. Huang, Z. Yin, Xuehong Mu, Yang Wang, Xiao-Tong Lu, Tianjue Zhang (2021). Design of the front-end electronics for parallel plate ion chamber. Radiation Detection Technology and Methods.DOI
Tianjue Zhang, Jing-Yuan Liu, Su-Ping Zhang, Peng Huang, J. Ling, Pengfei Zhu, Tian-Jian Bian, Wei Fu, Shenglong Wang, S. An, Zhaojun Jin, Ming Li, Zhenhui Wang, Chuan Wang, Yinlong Lv, Fei Wang, T. Cui, Z. Yin, Lei Cao, Hongru Cai (2020). Magnetic Field Measurement, Shimming and Processing for 230 MeV Superconducting Cyclotron Main Magnet. IEEE transactions on applied superconductivity.DOI
Xianlu Jia, Tianjue Zhang, G. Song, Feng Wang, Fei Wang, Guangda Yang, Jianjun Yang, Richard R. Johnson, Pengzhan Li, Shigang Hou, Gao-feng Pan, He Zhang, Jingfeng Wang (2020). 14 MeV high intensity cyclotrons: Two projects in progress.DOI
Tianjue Zhang, S. An, Tian-Jian Bian, F. Guan, Ming Li, S. Pei, Chuanze Wang, Wang Fei, Z. Yin (2020). A New Solution for Cost Effective, High Average Power (2 GeV, 6 MW) Proton Accelerator and its R&D Activities.DOI
Chuan Wang, Tian-Jian Bian, Ming Li, Wei Fu, Shenglong Wang, S. An, Tianjue Zhang (2020). Preliminary Study of the High Temperature Superconducting Solution for 2 GeV CW FFAG Magnet. IEEE transactions on applied superconductivity.DOI
Tianjue Zhang, B. Cui, Yinlong Lv (2020). BRIF: From the first proton beam to RIB production.DOI
Ming Li, Tianjue Zhang, Chuan Wang, Shenglong Wang (2020). Development of Precise Magnetic Field Shimming Algorithm for Inclined 45° Continuous Cutting on Spiral Pole of SC Cyclotron. IEEE transactions on applied superconductivity.DOI
Lu-Yu Ji, S. An, F. Guan, Huang Peng, Xianlu Jia, Yinlong Lv, Chuan Wang, Shenglong Wang, Tianjue Zhang, Xia Zheng (2020). The Design and Calculation on the Injection and Central Region for CYCIAE-50.DOI
Tianjue Zhang, Yinlong Lv, Su-Min Wei, Feng Wang, T. Ge, S. An, Lipeng Wen, Jing-Yuan Liu, Yaoqian Li, Gao-feng Pan, Yang Wang, Shiqiang Li, Zhenwei Liu, G. Song, Lei Cao, Wen Wang (2020). Isotope production by the high current proton beam of CYCIAE-100.DOI
Jian Zou, Xia Zheng, Nai-Gong Zeng, Xing-Dong Jiang, Tianjue Zhang (2020). Design and research of the discharge system of the pulse collimator. IEEE International Conference on High Voltage Engineering and Application.DOI
Tianjue Zhang, Ming Li, Yinlong Lv, Z. Yin, T. Ge, Xianlu Jia, S. An, Tian-Jian Bian, Chuan Wang, Bin Ji, S. Pei, Shenglong Wang (2020). 52 kW CW proton beam production by CYCIAE-100 and general design of high average power circular accelerator.DOI
Tianjue Zhang, Ming Li, Chuan Wang, Z. Yin, Dong-Sheng Zhang, Su-Min Wei, S. An, Xianlu Jia, F. Guan, Lu-Peng Ji, Shenglong Wang, M. Yin, Xia Zheng (2020). Investigation and quantitative simulation of beam physics for 230 MeV SC cyclotron under construction at CIAE.DOI
Leilei Guan, S. An, T. Cui, Peng Huang, Xianlu Jia, Ming Li, Fei Wang, Tianjue Zhang (2020). Magnetic Field Measurement and Shimming for a Medical Compact Cyclotron.DOI
T. Ge, Lei Cao, Zhen-He Fu, Shigang Hou, Bin Ji, J. Hao, Shiqiang Li, Yaoqian Li, Zhenwei Liu, Yinlong Lv, Gao-feng Pan, Lei Wang, Lipeng Wen, Z. Yin, Tianjue Zhang (2020). Three Years Operation of CYCIAE-100.DOI
Su-Min Wei, Tianjue Zhang, Feng Wang, S. An, T. Ge, Lipeng Wen, G. Song, Xia Zheng, Jing-Yuan Liu (2020). Development of 100 MeV Cyclotron High-power Proton Beam Line.
Jian Zou, Nai-Gong Zeng, Chuan Wang, Tianjue Zhang (2018). Design of Measuring Probe in High Voltage Fast Pulse System.
Tianjue Zhang, Chuan Wang, T. Cui, Ming Li, Yinlong Lv, Tao Ge, M. Yin, Su-Ping Zhang, Su-Min Wei, Jun Lin, Z. Yin, Jian-sheng Xing (2018). Design and Construction of the Main Magnet for a 230-MeV Superconducting Cyclotron. IEEE transactions on applied superconductivity.DOI
S. An, Lei Cao, F. Guan, Lu-Yu Ji, Ming Li, Xiao-Tong Lu, Chuan Wang, Yang Wang, Su-Min Wei, Lipeng Wen, Dongsheng Zhang, Tianjue Zhang (2018). The Acceleration and Extraction Simulation for Pulsed Beam with Different Phase Width for CYCIAE-100.DOI
Ming Li, Yinlong Lv, Lei Cao, Tianjue Zhang, Jian-sheng Xing, J. Tinembart, T. Cui, Chuan Wang, Fei Wang, Leilei Guan, Z. Yin, P. Gong, Guangda Yang (2018). Field Mapping System Design for the Superconducting Cyclotron CYCIAE-230. IEEE transactions on applied superconductivity.DOI
Chuan Wang, Tianjue Zhang, M. Yin, Su-Ping Zhang, Yinlong Lv, Tao Ge, Hongming Tang, Yu Cheng, R. Guo, Xihu Zhang, T. Cui, Z. Yin (2018). Superconducting Coil System R&D for a 230-MeV Superconducting Cyclotron. IEEE transactions on applied superconductivity.DOI
Tianjue Zhang, S. An, Yinlong Lv, Tao Ge, Xianlu Jia, B. Ji, Z. Yin, Gao-feng Pan, Lei Cao, F. Guan, Jianjun Yang, Zhen-guo Li, Zhen-Lu Zhao, Long-cheng Wu, He Zhang, Jingfeng Wang, Yiwang Zhang, Jing-Yuan Liu, Shiqiang Li, Xiao-Tong Lu, Zhenwei Liu, Yaoqian Li, Juanjuan Guo, Xuelong Cao, Leilei Guan, Fei Wang, Yang Wang, Guangda Yang, Su-Ping Zhang, Shigang Hou, Feng Wang (2017). mA beam acceleration efforts on 100 MeV H− cyclotron at CIAE☆.DOI
Xiao-Liang Fu, Z. Yin, B. Ji, Zhen-Lu Zhao, Jun-Yi Wei, Tianjue Zhang (2017). An automatic phase-matching technique of CYCIAE-100 cyclotron.DOI
Xiao-Liang Fu, Z. Yin, B. Ji, Pengzhan Li, Zhen-Lu Zhao, Tianjue Zhang (2017). General DSP firmware for cyclotron low level RF system.DOI
Pengzhan Li, Tianjue Zhang, B. Ji, Shigang Hou, Juanjuan Guo, M. Yin, Jian-sheng Xing, Yinlong Lv, F. Guan, Jun Lin (2017). Trimming algorithm of frequency modulation for CIAE-230 MeV proton superconducting synchrocyclotron model cavity.DOI
Tianjue Zhang, Chuan Wang, Ming Li, T. Cui, Z. Yin, B. Ji, Yinlong Lv, F. Guan, Tao Ge, Jian-sheng Xing, Jianjun Yang, Xianlu Jia, M. Yin, Su-Ping Zhang, Xuelong Cao, S. An, Su-Min Wei, Jun Lin, Lei Cao, Dong-Sheng Zhang, Shigang Hou, Feng Wang, P. Gong (2017). Developments for 230 MeV superconducting cyclotrons for proton therapy and proton irradiation.DOI
Yiwang Zhang, Hongru Cai, Lei Cao, Ge Tao, Su-Min Wei, Jianjun Yang, Z. Yin, Tianjue Zhang (2017). Control System Dedicated for Beam Line of Proton Radiography on 100 MeV Cyclotron CYCIAE-100.DOI
Shigang Hou, S. An, Zhenwei Liu, G. Song, Feng Wang, Lipeng Wen, Tianjue Zhang (2017). An Air Ionization Chamber Simulation using Monte Carlo Method.DOI
Dong-Sheng Zhang, Ming Li, Chuan Wang, Jianjun Yang, Tianjue Zhang (2017). Physical Design of the Extraction Trim-Rods in a 230 MeV Superconducting Cyclotron.DOI
Tianjue Zhang, Jianjun Yang (2017). 100 MeV H⁻ Cyclotron Development and 800 MeV Proton Cyclotron Proposal.DOI
Jianjun Yang, Hongru Cai, Lei Cao, Tao Ge, Zhen-guo Li, Yinlong Lv, Feng Wang, Su-Min Wei, Lipeng Wen, Su-Ping Zhang, Tianjue Zhang, Yiwang Zhang, X. Zhen (2017). Proton Radiography Experiment Based on a 100 MeV Proton Cyclotron.DOI
J. D. de Villiers, J. Broodryk, J. Conradie, F. Nemulodi, R. Thomae, Jianjun Yang, Tianjue Zhang (2017). Numerical Orbit Tracking in 3D Through the Injector Cyclotron for Heavy Ions at iThemba LABS.DOI
F. Nemulodi, J. Broodryk, J. Conradie, J. D. de Villiers, W. Duckitt, D. Fourie, J. Mira, R. Thomae, M. Van Niekerk, Jianjun Yang, Tianjue Zhang (2017). Injection Line Studies for the SPC2 Cyclotron at iThemba LABS.DOI
S. An, Lei Cao, Xiao-Liang Fu, Zhen-guo Li, Geng-Shou Liu, Yinlong Lv, Gao-feng Pan, Yang Wang, Lipeng Wen, Jian-sheng Xing, Tianjue Zhang, Yiwang Zhang (2017). The Assembly and Adjustment of the Second Stripping Probe System for CYCIAE-100.DOI
Ming Li, J. Zhong, T. Cui, Tianjue Zhang (2016). Application and Development of a Method to Shim the Isochronous Field in Small Cyclotrons. IEEE transactions on applied superconductivity.DOI
Tianjue Zhang, M. Yin, Chuan Wang, Ming Li, Yinlong Lv (2016). Magnetic field measuring device and magnetic field measuring method for positioning position of superconducting coil.
Z. Yin, Xiao-Liang Fu, B. Ji, Tianjue Zhang, Chuan Wang (2016). Digital control in LLRF system for CYCIAE-100 cyclotron.DOI
Tianjue Zhang, Jianjun Yang (2016). The beam commissioning of BRIF and future cyclotron development at CIAE.DOI
Tianjue Zhang, Z. Yin, Xiao-Liang Fu, B. Ji, Zhen-Lu Zhao, Juan-Juan Guo, Xuelong Cao, Pengzhan Li, Jun-Yi Wei (2016). Dual-drive four-resonant-cavity high-frequency D circuit.
Jianjun Yang, Ming Li, Tianjue Zhang, J. Zhong, G. Song, S. An (2016). Magnet Design of an 800 MeV High Power Proton Cyclotron. IEEE transactions on applied superconductivity.DOI
Tianjue Zhang, Yunlong Lu, J. Zhong, Jian-sheng Xing, Jianjun Yang, Lei Cao, W. Jing, Chuan Wang, Gao-feng Pan, Hong-juan Yao, Su-Ping Zhang, Ming Li, Su-Min Wei, Z. Yin, Zhenhui Wang, Jun Lin, Geng-Shou Liu, G. Song, T. Cui, Y. Lei, S. An, Tao Ge, Jian Zou, J. Zhao, Fang Yang (2016). Design, Construction, Installation, Mapping, and Shimming for a 416-ton Compact Cyclotron Magnet. IEEE transactions on applied superconductivity.DOI
S. An, F. Guan, Ming Li, Su-Min Wei, Tianjue Zhang, Jianjun Yang, P. R. China (2015). THE SIMULATION OF STRIPPING EXTRACTION PROCESS FOR CYCIAE-100 *.
Z. Yin, Xiao-Liang Fu, B. Ji, Zhen-Lu Zhao, Tianjue Zhang, Pengzhan Li, Jun-Yi Wei, Jian-sheng Xing, Chuan Wang (2015). RF control hardware design for CYCIAE-100 cyclotron.DOI
Jianjun Yang, Tianjue Zhang, Yinlong Lv (2015). NEW DEVELOPMENT OF THE HIGH POWER PROTON CYCLOTRONS AT CIAE.
Xianlu Jia, F. Guan, Hong-juan Yao, Tianjue Zhang, Jianjun Yang, G. Song, Tao Ge, J. Qin (2014). Ion source and injection line for high intensity medical cyclotron. Review of Scientific Instruments.DOI
Chuan Wang, B. Ji, Z. Yin, Tianjue Zhang, Zhen-Lu Zhao (2014). Applying the None-stationary Theory to the Multipacting Analysis of a Cyclotron RF Cavity.
Tianjue Zhang, Xianlu Jia, Zhen-guo Li, Yinlong Lu, J. Qin, Xia Zheng, Hong-juan Yao, J. Zhong, Gao-feng Pan, T. Ge, F. Guan (2014). Development of series H(-) multicusp ion source at China Institute of Atomic Energy. Review of Scientific Instruments.DOI
F. Guan, Huai-Dong Xie, Lipeng Wen, Tianjue Zhang, Zhen-guo Li, Z. Yin (2014). THE DEVELOPMENT OF RADIAL PROBE FOR CYCIAE-100.
Tianjue Zhang, Huili Yi, Yang Feng (2014). INSTALLATION AND TEST PROGRESS FOR CYCIAE-100.
Pengzhan Li, Z. Yin, B. Ji, Tianjue Zhang, Zhen-Lu Zhao (2014). Development of a low-level RF control system for PET cyclotron CYCIAE-14.DOI
Y. Lei, Z. Yin, Pengzhan Li, Tianjue Zhang, Jun-Yi Wei (2014). THE DESIGN AND TESTING OF AN AUTOMATIC RF CONDITIONING SYSTEM FOR THE COMPACT MEDICAL CYCLOTRON.
Chuan Wang, B. Ji, Pengzhan Li, Z. Yin, Y. Lei, Jian-sheng Xing, Tianjue Zhang, A. Adelmann, A. Gsell, M. Seidel (2013). A STUDY OF MULTIPACTING EFFECTS IN LARGE CYCLOTRON CAVITIES BY MEANS OF FULLY 3-DIMENSIONAL SIMULATIONS*.
Feng Wang, Xianlu Jia, T. Cui, Tianjue Zhang, Zhen-guo Li, Xingzhi Zhang (2013). Radiation Shielding Design for Medical Cyclotrons.
Jianjun Yang, Ming Li, Tianjue Zhang, J. Zhong, S. An (2013). PHYSICAL DESIGN PROGRESS OF AN 800 MeV HIGH POWER PROTON DRIVER.
Xianlu Jia, Tianjue Zhang, Feng Wang, Yinlong Lu, Su-Min Wei, Y. Bi, G. Song, Huai-Dong Xie (2013). Beam dump system design for 100 MeV high intensity proton cyclotron.DOI
Su-Min Wei, Tianjue Zhang, S. An, Ming Li, Xianlu Jia, G. Song (2013). Design of high uniformity, large spot beam line.DOI
Tianjue Zhang, Hong-juan Yao, Zhen-guo Li, F. Guan, Lipeng Wen, Huai-Dong Xie, S. An, Jian-Jun Yang (2013). Physical problems and beam test of compact cyclotron.DOI
S. An, Huidong Xie, Lipeng Wen, Z. Yin, F. Guan, Pengzhan Li, Tianjue Zhang (2013). THE DESIGN AND CONSTRUCTION OF STRIPPING PROBE SYSTEM FOR CYCIAE-100*.
Tianjue Zhang, B. Cui, Chaohua Peng, Zhen-guo Li, Yinlong Lu, Fang Yang (2013). THE CONSTRUCTION PROGRESS OF BEIJING RADIOACTIVE ION-BEAM FACILITY.
M. Li, Tianjue Zhang (2013). INVESTIGATION OF EMITTANCE GROWTH IN A SMALL PET CYCLOTRON CYCIAE-14.
Z. Yin, Tianjue Zhang, Yu Lei, Pengzhan Li, Zhen-Lu Zhao, B. Ji (2013). Cyclotron resonant cavity RF automatic exercise system.
Su-Ping Zhang, Tianjue Zhang, Gao-feng Pan, Jian-sheng Xing, Zhen-guo Li, Fang Yang (2013). THE M-C APPLICATION IN DESIGNING TAILORED CRYOPUMP USED IN CYCIAE-100 CYCLOTRON*.
Yinlong Lu, W. Jing, Zhenhui Wang, Tianjue Zhang (2013). MAIN MAGNET INSTALLATION FOR CYCIAE-100.
Z. Yin, Tianjue Zhang, Y. Lei, Pengzhan Li, Zhen-Lu Zhao, B. Ji (2013). Automatic exercising system of radio frequency resonant cavity of circular accelerator.
G. Song, Z. Yin, B. Ji, Jian-sheng Xing, Tianjue Zhang, Yinlong Lv, Pengzhan Li, Zhen-Lu Zhao, Yu Lei, Xiao-Liang Fu (2013). Process for brazing dissimilar material part of high-frequency window of small medical rotary accelerator.
Z. Yin, B. Ji, Y. Lei, G. Song, Tianjue Zhang, Zhenlu, Zhao (2013). THE DESIGN AND COMMISSIONING OF THE RF SYSTEM FOR CYCIAE-14 CYCLOTRON.
J. Zhong, T. Cui, Ming Li, Chuan Wang, Zhenhui Wang, Jianjun Yang, Tianjue Zhang (2013). EXPERIMENTAL STUDY OF MAGNETIC PROPERTIES FOR MAGNET MATERIAL IN CYCIAE-100.
Tianjue Zhang, Hong-juan Yao, Jianjun Yang, J. Zhong, S. An (2012). The beam dynamics study for the CYCIAE-100 cyclotron.DOI
Xianlu Jia, Tianjue Zhang, Xia Zheng, J. Qin (2012). Development of a compact filament-discharge multi-cusp H- ion source. Review of Scientific Instruments.DOI
Tianjue Zhang, Chuan Wang, Yinlong Lv, J. Zhong, Jianjun Yang, Su-Min Wei, Ming Li, S. An, Zi-Qi Zhou (2012). Magnet Design for a 70 MeV ${\rm H}^{-}/{\rm D}^{-}$ Dual Accelerating Particle Cyclotron. IEEE transactions on applied superconductivity.DOI
Tianjue Zhang, J. Zhong, Yinlong Lv, T. Cui, J. Qin, Jian-sheng Xing, Ming Li, Jianjun Yang, Gao-feng Pan, Fang Yang (2012). Magnet Design and Fabrication of CYCIAE-14, a 14 MeV PET Cyclotron. IEEE transactions on applied superconductivity.DOI
Chuan Wang, A. Adelmann, Tianjue Zhang, Xing-Dong Jiang (2012). Simulation code development for field emission and multipacting for cavities.DOI
Tianjue Zhang, Xianlu Jia, J. Qin, Yinlong Lv, Xia Zheng (2012). Experimental development on the 18 mA, H- multi-cusp ion source at China Institute of Atomic Energy. Review of Scientific Instruments.DOI
Tianjue Zhang, S. An, Chuan Wang, Z. Yin, Su-Min Wei, Ming Li, Jianjun Yang, B. Ji, Xianlu Jia, J. Zhong, Fang Yang (2011). Physics Design of a 70 MeV High Intensity Cyclotron.DOI
Tianjue Zhang, Zhen-guo Li, S. An, Z. Yin, Jianjun Yang, Fang Yang (2011). The cyclotron development activities at CIAE.DOI
Jianjun Yang, Tianjue Zhang, Yuzheng Lin, A. Adelmann, Feng Wang, S. An (2011). High performance computation on beam dynamics problems in high intensity compact cyclotrons.DOI
J. Zhong, Tianjue Zhang, Ming Li, Yinlong Lv, T. Cui, Jianjun Yang, Jian-sheng Xing (2011). The physics design of magnet in 14 MeV cyclotron.DOI
Tianjue Zhang, Chuan Wang, J. Zhong, Hong-juan Yao (2011). Investigation for the vertical focusing enhancement of compact cyclotron by asymmetrical shimming bar.DOI
Tianjue Zhang, J. Zhong, Ming Li, Chuan Wang, Yinlong Lu, Xing-Dong Jiang, Jianjun Yang, Jun Lin, Fang Yang (2011). Development and application of a new method to shim first harmonic in compact cyclotron.DOI
Tianjue Zhang, Yinlong Lu, Z. Yin, J. Zhong, T. Cui, Min Li, Su-Min Wei, G. Song, Long-cheng Wu, B. Ji, Jian-sheng Xing, J. Qin, Xianlu Jia, Weiping Hu, Jianjun Yang, S. An, F. Guan, X. Zhen, Lipeng Wen, Jun Lin, Zhen-guo Li, Xing-Zhi Zhang, Yuexin Cai, Fang Yang (2011). Overall design of CYCIAE-14, a 14 MeV PET cyclotron.DOI
S. An, Z. Yin, Pengzhan Li, G. Song, Long-cheng Wu, F. Guan, Huai-Dong Xie, Xianlu Jia, Yinlong Lu, Tianjue Zhang (2011). The design and construction of a pulsed beam generation system based on high intensity cyclotron.DOI
Tianjue Zhang, M. Fan, Su-Min Wei, Sheng-Zu Chen, Fang Yang (2011). The present situation and the prospect of medical cyclotrons in China.DOI
Ming Li, Tianjue Zhang, Huai-Dong Xie, T. Cui, Weiping Hu, J. Qin, Z. Yin, Yinlong Lu, Lipeng Wen, Jian-sheng Xing (2011). Beam Extraction System for CYCIAE-14.
Tianjue Zhang, Zhen-guo Li, Cheng-jie Chu, Jian-sheng Xing, F. Guan, J. Zhong, B. Ji, Tao Ge, Z. Yin, Shigang Hou, Gao-feng Pan, Hong-juan Yao, Yinlong Lu, Zhenhui Wang, Long-cheng Wu, Jun Lin, Xianlu Jia, Su-Min Wei, Lipeng Wen, Feng Wang, L. Xia, Hongru Cai, Huai-Dong Xie, Rongfan Chen, Yan Zhang, Su-Ping Zhang, Geng-Shou Liu, Jian Zou, S. An, Jianjun Yang, Y. Bi, Fang Yang (2011). Comprehensive test stand for high-intensity cyclotron development.DOI
Tianjue Zhang, Ming Li, J. Zhong, S. An, Su-Min Wei (2011). Beam dynamics study for a small, high current 14 MeV PET cyclotron.DOI
Tianjue Zhang, Jianjun Yang, Ming Li, L. Xia, S. An, Z. Yin, J. Zhong, Fang Yang, W. Joho, A. Adelmann, Peter Sigg (2011). Conceptual design of an 800 MeV high power proton driver.DOI
张天爵,关遐龄,崔保群 (2010). Design and construction progress of BRIF. Chinese Physics C.
Y. Bi, A. Adelmann, R. Dölling, M. Humbel, W. Joho, M. Seidel, Tianjue Zhang (2010). Towards quantitative simulations of high power proton cyclotrons.DOI
Tianjue Zhang, Xianlu Jia, Yinlong Lv, Jian Zou, F. Guan, Long-cheng Wu, Gao-feng Pan, Geng-Shou Liu, Jun Lin, Tao Ge, Hong-juan Yao, Zhenhui Wang, S. An (2010). Experimental study for 15-20 mA dc H- multicusp source. Review of Scientific Instruments.DOI
Xianlu Jia, Tianjue Zhang, S. Luo, Chuan Wang, Xia Zheng, Z. Yin, J. Zhong, Long-cheng Wu, J. Qin (2010). Design of a compact, permanent magnet electron cyclotron resonance ion source for proton and H2(+) beam production. Review of Scientific Instruments.DOI
Tianjue Zhang, J. Zhong, Jianjun Yang, Yinlong Lv, Su-Min Wei, Hong-juan Yao (2010). IMPERFECTION INVESTIGATION FOR THE MAIN MAGNET CONSTRUCTION FOR COMPACT CYCLOTRON *.
Tianjue Zhang, Zhen-guo Li, Yinlong Lu (2010). PROGRESS ON CONSTRUCTION OF CYCIAE-100.
Y. Bi, A. Adelmann, M. Humbel, W. Joho, M. Seidel, Tianjue Zhang, C.-X. Tang (2010). CHALLENGES IN SIMULATING MW BEAMS IN CYCLOTRONS.
Chuan Wang, J. Zhong, Tianjue Zhang, Jian-Zhong Wang, Yinlong Lv, Wei Jin, Jun Lin, Jian-sheng Xing, Ji-Sheng Wang, G. Mackenzie (2010). Investigation on Annealing Procedure for Large Casting Steel for CYCIAE-100. IEEE transactions on applied superconductivity.DOI
Z. Yin, F. Guan, Shigang Hou, B. Ji, Zhen-guo Li, Lipeng Wen, Huai-Dong Xie, Tianjue Zhang (2010). BEAM PHASE MONITOR SYSTEM DESIGN FOR 100 MEV CYCLOTRON.
Y. Bi, Tianjue Zhang, Chuan-Xiang Tang, Yong-Sheng Huang, Jianjun Yang (2010). Analytic model for the breakup of a coasting beam with space charge in isochronous accelerators.DOI
Z. Yin, Zhen-Lu Zhao, Shidong Wei, Yong Xie, Zhen-guo Li, B. Ji, Haichao Xiao, Tianjue Zhang (2010). DESIGN, CONSTRUCTION AND COMMISSIONING OF THE 100KW RF AMPLIFIER FOR CYCIAE-100.
Jianjun Yang, Tianjue Zhang, Xianlu Jia, Chuan Wang, Ming Li, Hong-juan Yao, Yinlong Lv (2010). THE INJECTION LINE AND CENTRAL REGION DESIGN OF CYCIAE-70*.
J. Zhong, Yinlong Lv, Z. Yin, Tianjue Zhang, Jian-sheng Xing (2010). The Design of Magnetic Field Measurements System for CYCIAE-100. IEEE transactions on applied superconductivity.DOI
B. Ji, Z. Yin, Tianjue Zhang, Jian-sheng Xing, Zhen-Lu Zhao, Jun Lin, Xia Zheng, Pengzhan Li, Geng-Shou Liu, Zhenhui Wang, Gao-feng Pan, Su-Ping Zhang (2010). DESIGN AND PRIMARY TEST OF FULL SCALE CAVITY OF CYCIAE-100.
Xianlu Jia, Tianjue Zhang, Xia Zheng, Su-Ping Zhang, Jian Zou, Jun Lin (2010). Emittance improvement efforts on the 15-20 mA dc H- multicusp source. Review of Scientific Instruments.DOI
Jianjun Yang, A. Adelmann, M. Humbel, M. Seidel, Tianjue Zhang (2010). Beam dynamics in high intensity cyclotrons including neighboring bunch effects: Model, implementation, and application.DOI
Yinlong Lv, Tianjue Zhang, Xianlu Jia, Su-Min Wei (2010). Method and device for high homogenization of beams.
M. Fan, Tianjue Zhang, J. Xia (2010). MEDICAL CYCLOTRON AND DEVELOPMENT IN CHINA.
Tianjue Zhang, Jianjun Yang, Rongfan Chen, Su-Min Wei, J. Zhong, Chuan Wang (2010). Deformation Calculation and Optimal Design of the Compact Magnet for CYCIAE-100. IEEE transactions on applied superconductivity.DOI
Tianjue Zhang, Su-Min Wei, G. Song, Jianjun Yang, J. Zhong, Yinlong Lu, Cheng-jie Chu (2010). Design and Test of Various Adjusting Coils for ${\rm H}^{-}$ Compact Cyclotron. IEEE transactions on applied superconductivity.DOI
Su-Min Wei, Tianjue Zhang (2010). BEAM OPTICS STUDY ON THE EXTRACTION REGION FOR A HIGH INTENSITY COMPACT CYCLOTRON *.
Su-Min Wei, Yinlong Lu, Tianjue Zhang, Cheng-jie Chu, Zhenhui Wang, Long-cheng Wu, J. Zhong, S. Luo, Geng-Shou Liu, Tao Ge (2010). Development of Specially Designed Small Doublet for Compact Cyclotron Beam Injection. IEEE transactions on applied superconductivity.DOI
Z. Yin, K. Fei, G. Song, Tianjue Zhang, B. Ji, Pengzhan Li, Geng-Shou Liu (2010). AMPLIFIER TEST STAND FOR THE CRM CYCLOTRON.
Hong-juan Yao, Zhen-guo Li, Tao Ge, Long-cheng Wu, F. Guan, Yinlong Lv, Zhenhui Wang, Geng-Shou Liu, Tianjue Zhang, Hongru Cai (2010). The injection efficiency measurement and analysis for central region model cyclotron. Review of Scientific Instruments.DOI
Su-Min Wei, Ming Li, S. An, Tianjue Zhang (2010). Influence to the Extracted Beam Optics Induced by Fringe Field Effect of CYCIAE-100.
Tianjue Zhang, Yinlong Lu, J. Zhong, Cheng-jie Chu, Rongfan Chen, W. Jing, Jun Lin, Jianjun Yang, Chuan Wang, Jian-sheng Xing, Zhen-guo Li, Zheng-He Zhou, M. Fan, Ji-Sheng Wang (2010). Construction Status of Main Magnet for CYCIAE-100. IEEE transactions on applied superconductivity.DOI
Hong-Zhi Yao, Tianjue Zhang, Feng-Ping Guan, J. Zhong (2009). Vertical focusing study in the central region of the CYCIAE-100 cyclotron.DOI
Y. Bi, Tianjue Zhang, Xianlu Jia, Zheng-He Zhou, Feng Wang, Su-Min Wei, J. Zhong, Chuan-Xiang Tang (2009). Study on CYCIAE-100 radiation field and residual radioactivity.DOI
Su-Min Wei, Tianjue Zhang, S. An, Y. Bi (2009). Study of energy deposition and stripper temperature for CYCIAE-100.DOI
Tianjue Zhang (2009). Isochronous Magnetic Field Shimming Method for Compact Cyclotrons.
Pengzhan Li, K. Fei, Shigang Hou, B. Ji, L. Xia, Z. Yin, Tianjue Zhang, Fang Yang (2009). Alternative Cavity Tuning Control for Crm Cyclotron.
Tianjue Zhang, Zhen-guo Li, J. Zhong, S. An, Hong-juan Yao, B. Ji, Su-Min Wei, F. Guan, Jianjun Yang, Y. Bi, Xianlu Jia, Chuan Wang (2009). Physics design of CYCAIE-100.DOI
Chuan Wang, Jianjun Yang, J. Zhong, Tianjue Zhang(2009). 小型サイクロトロン加速器における1種の性磁場磁場アルゴリズム【JST・京大機械翻訳】.
Tianjue Zhang, M. Fan, Zhen-guo Li, Cheng-jie Chu, the Cyclotron Team at Ciae (2009). Research progress in high intensity cyclotron technology.DOI
J. Zhong, S. An, Hong-juan Yao, Tianjue Zhang, Y. Bi (2009). Influence of radial magnetic field on emittance in the median plane at CYCIAE-100.DOI
Tianjue Zhang, Su-Min Wei, G. Song, Jianjun Yang, J. Zhong, Cheng-jie Chu (2009). Correction Coil System for Compact High Intensity Cyclotron.
S. An, F. Guan, Huai-Dong Xie, Su-Min Wei, Hong-juan Yao, Y. Bi, J. Zhong, Xianlu Jia, Tianjue Zhang, Yinlong Lu, G. Song, B. Ji, T. Ge (2009). HADRON ACCELERATORS: Stripping extraction calculation and simulation for CYCIAE-100.DOI
S. An, F. Guan, Huai-Dong Jie, Su-Min Wei, Hong-juan Yao, Y. Bi, J. Zhong, Xianlu Jia, Tianjue Zhang, Yinlong Lv (2009). Stripping extraction calculation and simulation for CYCIAE-100.
纪彬,赵振鲁,张天爵,邢建升,王修龙,殷治国,侯世刚,夏乐(2008). 100MeV负氢回旋加速器高频冷模腔的理论与实验研究. Chinese Physics C.
张天爵,储诚节,钟俊晴,吕银龙,陈荣范,杨建俊,樊明武(2008). 100MeV回旋加速器主磁铁设计与工艺技术研究. Chinese Physics C.
姚红娟,吕银龙,张天爵,李振国,贾先禄,管锋平,王振辉,林军,林郁正(2008). 强流回旋加速器中心区模型试验装置上偏转板和中心区技术研究. Chinese Physics C.
魏素敏,张天爵,邢建升,李振国,储诚节,吴隆成,贾先禄,潘高峰,葛涛,解怀东,吕银龙,侯世刚,管峰平,安世忠,钟俊晴,杨健俊,姚红娟(2008). 30MeV医用回旋加速器气体靶束流线的研制. Chinese Physics C.
钟俊晴,吕银龙,殷治国,张天爵,储诚节,王川,王振辉,邢建升,李振国,林军,葛涛,吴隆诚,安世忠,姚红娟,贾先禄,魏素敏,邹俭,王峰,蔡红茹(2008). 强流回旋加速器综合试验装置的磁场测量与垫补. Chinese Physics C.
Su-Min Wei, S. An, Tianjue Zhang, Y. Rao, Xianlu Jia, Yinlong Lv, Hong-juan Yao, Zheng-He Zhou, Z. Yin (2008). Transfer beamline design after stripping extraction for CYCIAE-100.DOI
Tianjue Zhang, Zhen-guo Li, Z. Yin (2008). Design & construction status of CYCIAE-100, a 100 MeV H− cyclotron for RIB production.DOI
M. Fan, B. Qin, De-Zhi Chen, Yong-Qian Xiong, J. Xiong, T. Yu, Jun Yang, Yi-Zhang Feng, Dong Li, Lei Cao, Cheng-jie Chu, Tianjue Zhang (2008). Progress in Virtual Prototyping for design of compact cyclotrons. International Conference on Electrical Machines and Systems.
Y. Bi, Tianjue Zhang, Yong-Sheng Huang, S. An, F. Guan, Chuan-Xiang Tang (2008). Cosine gradient theory in cyclotrons with general dees.DOI
Su-Min Wei, Tianjue Zhang, Jian-sheng Xing, Zhen-guo Li, Cheng-jie Chu, Long-cheng Wu, Xianlu Jia, Gao-feng Pan, T. Ge, Huai-Dong Xie, Yinlong Lu, Shigang Hou, F. Guan, S. An, J. Zhong, Jianjun Yang, Hong-juan Yao (2008). Beam Line Design and Construction of Gas Target for a 30MeV Medical Cyclotron.
Hong-juan Yao, Tianjue Zhang, Yinlong Lu, Xianlu Jia, F. Guan, Yuzheng Lin (2008). Matching from H(-) multicusp source to central region of a 100 MeV compact cyclotron for high current injection. Review of Scientific Instruments.DOI
Tianjue Zhang, J. Zhong, Hong-juan Yao, Su-Min Wei, B. Ji, S. An, Jianjun Yang, Y. Bi, Chuan Wang, Xianlu Jia, Feng Wang, M. Fan (2008). Multi-physics field simulation for CYCIAE-100. International Conference on Electrical Machines and Systems.
Tianjue Zhang, Zhen-guo Li, Yinlong Lu, Su-Min Wei, Hongru Cai, T. Ge, Long-cheng Wu, Gao-feng Pan, Hong-juan Yao, T. Kuo, D. Yuan (2008). Ion source and low energy injection line for a central region model cyclotron. Review of Scientific Instruments.DOI
杨建俊,张天爵,安世忠,贾先禄,林郁正(2007). 基于PIC方法的二维束流动力学模拟程序及其初步应用. Chinese Physics C.
Tianjue Zhang, Cheng-jie Chu (2007). DESIGN AND CONSTRUCTION PROGRESS OF CYCIAE-100, A 100 MEV H- CYCLOTRON AT CIAE *.
Xianlu Jia, Tianjue Zhang, Lyu Yinlong, Chang-Jun Ai, Cheng-jie Chu, F. Guan, Jian-sheng Xing (2007). Wobbling Magnet Design for Beam Line of CYCIAE-30 Medical Cyclotron.
Tianjue Zhang, Hong-juan Yao, F. Guan, Cheng-jie Chu, Yinlong Lu, Xianlu Jia, J. Zhong, Jianjun Yang, Jian-sheng Xing, Yuzheng Lin (2007). Spiral inflector and central region study for three cyclotrons at CIAE.DOI
Xiu-Long Wang, Zhen-Lu Zhao, B. Ji, Tianjue Zhang, Z. Yin, Shigang Hou, L. Xia, Zhen-guo Li (2007). The alternative of RF system design for the 100 MeV cyclotron at CIAE.DOI
Su-Min Wei, Yinlong Lv, Tianjue Zhang, Zheng-He Zhou, Zhen-guo Li, Cheng-jie Chu, Long-cheng Wu, Xianlu Jia, F. Guan, Gao-feng Pan, Z. Yin, Shigang Hou, Tao Ge, S. An (2007). Beam line design for a 100 MeV high intensity proton cyclotron at CIAE.DOI
Tianjue Zhang, Zhen-guo Li, Cheng-jie Chu (2007). CYCIAE-100, a 100 MeV H− cyclotron for RIB production ☆.DOI
Hong-juan Yao, R. Baartman, Y. Rao, Tianjue Zhang, Yuzheng Lin (2007). GAP-CROSSING RESONANCE IN CYCIAE-100 CYCLOTRON.
Tianjue Zhang, Yinlong Lu, F. Guan, Xianlu Jia, J. Zhong, Hong-juan Yao, Yuzheng Lin (2007). THE STUDY AND DESIGN OF SPIRAL INFLECTOR AND CENTRAL REGION FOR CYCIAE-100 CYCLOTRON.
B. Qin, Jun Yang, Yong-Qian Xiong, De-Zhi Chen, T. Yu, Tian-Lin Dong, Tianjue Zhang, M. Fan (2007). A pythonic integrated solution for virtual prototyping of cyclotrons.DOI
S. An, Tianjue Zhang (2007). TEST BEAM LINE FOR PULSED BEAM GENERATION AT CIAE'S CRM CYCLOTRON.
Y. Bi, Tianjue Zhang, B. Ji, Hong-juan Yao, S. An, Jian-sheng Xing, Chuan-Xiang Tang (2007). THE STUDY ON RF CAVITY TOLERANCE FOR CYCIAE-100*.
Z. Yin, Shigang Hou, Le Xia, Tianjue Zhang, Zhen-Lu Zhao, Xiu-Long Wang, B. Ji, Zhen-guo Li (2007). Design of a Digital LLRF Control System for the 100MeV High Intensity Cyclotron.
Xianlu Jia, Tianjue Zhang (2007). STUDY ON SPACE CHARGE EFFECT IN THE SPIRAL INFLECTOR.
Tianjue Zhang, X. Guan, B. Cui (2004). A NEW PROJECT OF CYCLOTRON BASE RADIOACTIVE ION BEAM FACILITY.
Tianjue Zhang, Zhen-guo Li, Cheng-jie Chu, Long-cheng Wu, J. Zhong, C. Jiao, Tao Ge, Gao-feng Pan, F. Guan (2004). H− cusp source development for 100 MeV compact cyclotron at China Institute of Atomic Energy.DOI
Cheng-jie Chu, J. Zhong, Tianjue Zhang, Z. Yin (2004). Preliminary Structure Design of the Main Magnet for the 100mev Cyclotron.
Tianjue Zhang, Hong-juan Yao, X. Guan, Cheng-jie Chu, J. Zhong, Z. Yin (2004). Numerical investigation for high intensity H− beam injection to a 100 MeV compact cyclotron.DOI
Wei-Ping Liu, Zhi-Hong Li, Xi-xiang Bai, You-Bao Wang, G. Lian, S. Zeng, Sheng-Quan Yan, Bao-xiang Wang, Zhi-Xiang Zhao, Tianjue Zhang, Hong-Qing Tang, Bing-Fang Yang, X. Guan, B. Cui (2003). Current progress of nuclear astrophysics study and BRNBF at CIAE.DOI
张天爵,G.D.Alton(2002). 在线同位素分离装置的靶系统设计方法. Chinese Physics C.
Tianjue Zhang (2002). Design Method for ISOL′s Target System.
M. Fan, Tianjue Zhang, B. Cui, Zhen-guo Li, Cheng-jie Chu, Wei-sheng Jiang, T. Yu, M. Xiao, X.-W. Dai, F. Guan, Gao-feng Pan (2001). Some R&D for the update project of Beijing Tandem Laboratory. PACS2001. Proceedings of the 2001 Particle Accelerator Conference (Cat. No.01CH37268).DOI
Tianjue Zhang, X. Guan, Zhen-guo Li, J. Qin, Bing-Fang Yang, Cheng-jie Chu, B. Cui, Xiu-Long Wang, Xing-Dong Jiang, Shuhe Xu, M. Fan, Zhi-Xiang Zhao (2001). RESEARCH ACTIVITIES RELATED TO LOW ENERGY ACCELERATORS IN CIAE.
C. Chu, Tianjue Zhang, M. Fan (1999). Operation experience of CYCIAE30 injector. Proceedings of the 1999 Particle Accelerator Conference (Cat. No.99CH36366).DOI
M. Fan, Tianjue Zhang (1997). Initial operation of CIAE medically used cyclotron. Proceedings of the 1997 Particle Accelerator Conference (Cat. No.97CH36167).DOI